Al Powers Co. & American Construction Co. Deepen Blair to 52'
Blair Waterway in Tacoma Washington on a clear September morn with a 14,000 ft. bump in the background (Mt. Rainier) - Derrick MUKILTEO to the left
Derrick NITRO of Al Powers Co. in the Blair ready to dig
Derrick MUKILTEO of American Construction read to dig
Brian Langdon of Al Powers Co. under way in a traditional designed low turbulence laminar flow runabout (dredge style)
Jarvis Frederick of American Construction & Brian Langdon of Al Powers team up to deepen the Blair. Good Team.
MUKILTEO Bucket moving mud
Seattle district ACOE hydrographic survey vessel checking the amount of material to be removed
The old standby in the Pacific Northwest - Douglas Fir ships out of Tacoma
NITRO & MUKILTEO running WINOPS Dredge Positioning Software - Excellent